Robot | Path | Permission |
GoogleBot | / | ✔ |
BingBot | / | ✔ |
BaiduSpider | / | ✔ |
YandexBot | / | ✔ |
Title | IBB16 ® - Leading potable water |
Description | IBB16 ® is the leading method for trenchless pressure pipe rehabilitation. High process safety☑️ Up to 232 psi☑️ 1600ft+☑️ 6" - |
Keywords | potable water liner, pressure pipe rehabilitation, ibb16 |
WebSite | ibb16.com |
Host IP | 35.240.1.10 |
Location | United States |
Site | Rank |
US$2,123
Last updated: 2023-05-20 07:30:40
ibb16.com has Semrush global rank of 0. ibb16.com has an estimated worth of US$ 2,123, based on its estimated Ads revenue. ibb16.com receives approximately 244 unique visitors each day. Its web server is located in United States, with IP address 35.240.1.10. According to SiteAdvisor, ibb16.com is safe to visit. |
Purchase/Sale Value | US$2,123 |
Daily Ads Revenue | US$1 |
Monthly Ads Revenue | US$58 |
Yearly Ads Revenue | US$705 |
Daily Unique Visitors | 16 |
Note: All traffic and earnings values are estimates. |
Host | Type | TTL | Data |
ibb16.com. | A | 7199 | IP: 35.240.1.10 |
ibb16.com. | NS | 86400 | NS Record: ns9-2.cvtdns.com. |
ibb16.com. | NS | 86400 | NS Record: ns9-3.cvtdns.com. |
ibb16.com. | NS | 86400 | NS Record: ns9-4.cvtdns.com. |
ibb16.com. | NS | 86400 | NS Record: ns9-1.cvtdns.com. |
ibb16.com. | TXT | 86400 | TXT Record: google-site-verification=0srBUyw_Rxm-8xqWp5jRWqpRUK2kYwlwgWDlHfgOnfw |
Choose Language Imprint & Data Privacy Advantages of trenchless rehabilitation Why you should refurbish instead of replacing the pipe IBB16 ® UV Cross section view total Liner with Inner Coating: IBB16 ® The leading method for trenchless pressure pipe rehabilitation Less environmental pollution Less process costs for disposal of soil, old pipe and transport Faster implementation Less traffic obstruction due to smaller excavation pit Environmental Aspects Potable water pipe DN 800, 150 m length Soil volume to replace IBB16 72m 3 / Dig and replace 2.700m 3 Old pipe disposal IBB16 0,29m 3 / Dig and replace 7,35m 3 Truck loads Trenchless 3 / Dig and replace 98 Construction time Trenchless 10 days / Dig and replace 60 days Replacement of Pavement IBB16 12m 3 / Dig and replace 225m 3 Reduction of emissions of all greenhouse gases caused by construction machinery such as CO2, CO, NOx, TOC, and SOx , smoke and other particulates. Very significant for every meter converted from trench to |
HTTP/1.1 307 Temporary Redirect Content-Type: text/html; charset=utf-8 Location: https://ibb16.com/ Vary: Accept-Encoding Date: Sun, 22 Jan 2023 09:07:35 GMT HTTP/2 200 content-type: text/html; charset=utf-8 vary: Accept-Encoding date: Sun, 22 Jan 2023 09:07:36 GMT |